571-233-5133 Free Estimate
A marble bathroom with a freestanding tub, a walnut double vanity with brass fixtures, and a glass shower

Bathroom remodeling

Wet-area work done in the right order, so what goes behind the tile is right before the tile goes on.

Almost every bathroom failure is a waterproofing failure, and it shows up two years later inside a wall or on the ceiling below. The visible half of a bathroom is the easy half.

We build the substrate and the waterproofing to the manufacturer’s specification, and we will show you that stage before it is covered.

A brushed brass wall faucet over a honed marble basin
A walk-in marble shower with a brass rain head, a niche, and frameless glass

Typical scope

  • Full strip-out back to studs where the condition warrants it
  • Waterproofing and substrate for showers and wet areas
  • Tile, including floors, walls, and shower enclosures
  • Vanities, fittings, and fixtures
  • Plumbing relocation and supply and waste replacement
  • Extraction, lighting, and code-compliant electrical
  • Accessible layouts — level thresholds, grab-bar blocking, wider doorways

Common questions

What goes on behind the tile?

Waterproofing and the right substrate, before any tile goes on. Where the condition of the room warrants it we strip back to the studs first.

A bathroom fails from behind the tile, not from the tile, which is why this is the part of the job the order of work is built around.

Can a bathroom be made more accessible?

Yes. Level thresholds, blocking in the walls for grab bars, and wider doorways are all part of what we fit, and blocking is far cheaper to put in now than to add later.

Can the toilet, bath, or shower be moved?

Yes. Plumbing relocation, along with supply and waste replacement, is normal scope rather than an extra.

Other services

All services
Call 571-233-5133 Text us